Prepare your calendar artwork.
Artwork and publication specifications
Send us the assets and we’ll lay it out. House-template layout and one consolidated round of minor amendments are included. You approve the PDF and web proofs before publication.
Supply text and images, or a finished design
Supply the event information and booking link, a transparent PNG logo ideally 1,200 pixels wide, and a landscape image ideally 2,400 × 1,350 pixels. Quarter-page placements can use just a logo. PNG/JPEG/WebP images: up to 5 MB each. Confirm usage rights, image descriptions and any credit.
Finished artwork: a high-quality PDF at the placement size below, embedded fonts/live text where possible, sRGB, no bleed or crop marks, with images around 300 ppi at placed size. Maximum 10 MB. Keep essential text inside a 5 mm safe area. Separate text and image sources are still required for responsive, accessible HTML.
Private uploads open in your paid booking workspace. We check the stored file type and size. You approve the final crop and PDF/web proof before publication. No artwork upload is required to make an initial request.
Placement sizes and copy limits
- Quarter page: 185 × 58 mm; up to 50 words of promotional body copy.
- Half page: 185 × 122 mm; up to 100 words of promotional body copy.
- Full page: 185 × 250 mm; up to 200 words of promotional body copy.
- Half-page image: equal 84.5 mm image and text columns, separated by 6 mm. The image matches the text block’s height; its approved crop is not fixed at 16:9.
- Leave the top 6 mm of the 5 mm safe area clear for the publisher disclosure. Body text stays at least 11 pt; essential metadata at least 9 pt.
- A4 portrait PDF, 210 × 297 mm. Dimensions include internal padding and paid-placement disclosure; core event metadata is separate from body-copy limits.
Production dates and changes after publication
- 30 November 2026: booking requests close.
- 2 December: accepted-booking payment, copy and assets due.
- 7 December: PDF and web proofs issued.
- 8 December: one consolidated set of minor amendments due.
- 9 December: explicit final proof approval due.
- 10 December: production lock.
- 15 December: publication.
Deadlines are 5 pm Australia/Melbourne. Confirmed production capacity and booking terms govern acceptance; silence is not proof approval. Factual web corrections remain available after review. Material PDF errors may require a versioned replacement, but already-downloaded copies cannot be changed.
This is a PDF + web product, without a print run. Bespoke creative, repeated redesigns and unrelated multi-event programmes require a separate quote.